OptimusM Abundance

Watch list · plants, pads, compute, tunnels

Sites

As of 22 Aug 2026 · Europe/Zurich · 39 sites · 33 on the map

Compiled 22 Aug 2026 (Europe/Zurich). Numeric claims are only those found in named sources; unknown fields are null. Prefer Tesla Q2 2026 Exhibit 99.1 and 10-K FY2025 over blogs. Footnotes.

Biggest gaps: site-level headcount is almost never published (Tesla 10-K is company-wide; SpaceX ~22,000 FT is company-wide; Bastrop’s 1,590 is the rare 2026 named-manager figure). Utilization is qualitative — no invented percentages. Floor area often Wikipedia or old permits. Six sites have no public coordinates.

Map

Carto Dark / OSM · markers by owner

  • Tesla
  • SpaceX
  • xAI
  • Neuralink
  • Boring
  • joint

Not on the map (no public lat/lon): Tesla Shanghai Supercharger Factory; Tesla Lathrop (automotive parts / foundry support); Tesla India factory (cancelled); KSC Roberts Road Gigabay / HangarX (Starship integration); Neuralink Del Valle / Austin manufacturing campus (ATX1); Dubai Loop (RTA pilot).

Inventory

Primary sourced figures · † unconfirmed · — unknown

Owner

Status

Showing 39 of 39

Site Owner Location Scope Size Investment Year Employees Status Utilization
Tesla Fremont Factory TeslaFremont, California, United StatesModel 3 / Model Y vehicle assembly. Former Model S/X lines decommissioned Q2 2026; first-generation Optimus production lines being…>550,000 vehicles/year$42M201022,000 †operatingTesla Q2 2026: S/X lines decommissioned; 3/Y still Production at >550k nameplate. Battery pack capacity is the company-stated limiter on near-term volume. Optimus lines Construction / start production soon as of 22 Jul 2026. No Tesla-published utilization percent.
Tesla Kato Road (4680 pilot / former SolarCity) TeslaFremont, California, United StatesHistorically Tesla's 4680 battery pilot factory (often cited ~10 GWh). Separate from the main NUMMI Fremont assembly plant. Current 2026…506,409 sq_ft †—2015—operating—
Gigafactory Nevada (incl. Semi building) TeslaStorey County (Tahoe-Reno Industrial Center), Nevada, United StatesLithium-ion cells (Panasonic partnership historically; Tesla LFP ramp), battery packs, drive units/motors, Powerwall, Tesla Semi assembly…>6 GWh/year$3.6B20167,000 †operatingPowerwall Production; LFP Early Ramp; Semi Commissioning as of 22 Jul 2026 IR. Trade press (TT News): first unit off high-volume Semi line 29 Apr 2026; 50,000/year factory target is trade-press, not Tesla IR. Tesla dropped 2026 volume production language (TechCrunch on Q2 vs Q1 decks).
Gigafactory Shanghai (vehicles) TeslaNanhui New Town, Pudong, Shanghai, ChinaModel 3 and Model Y vehicle manufacturing for China and export. Wholly foreign-owned (no JV). Largest Tesla vehicle nameplate in Q2 2026…>950,000 vehicles/year$2B201920,000 †operatingProduction at >950k nameplate. Battery pack capacity is the global limiter (Q2). No Tesla-published 2026 utilization percent.
Megafactory Shanghai (Megapack) TeslaShanghai, China (Lingang / Pudong cluster)Megapack energy-storage assembly. Q2 2026: 20 GWh Production; record deployments from this plant in the quarter.20 GWh/year—2025—operatingQ2 2026: record deployments from Megafactory Shanghai, which continues to ramp production. No percent.
Tesla Shanghai Supercharger Factory no pin TeslaShanghai, ChinaSupercharger hardware manufacturing. Wikipedia list: ~54,000 ft2, cited annual production of 10,000 chargers (2021-era).54,000 sq_ft †—2021—operating—
Gigafactory Berlin-Brandenburg TeslaGrünheide (Mark), Brandenburg, GermanyModel Y vehicle assembly; 4680 cell factory listed Construction in Q2 2026. Tesla's first European manufacturing plant.>375,000 vehicles/year—202211,500 †operatingModel Y Production at >375k nameplate. Berlin 4680 Construction. Secondary 2025-26 German press: expansion toward 1M/year on hold; not in Q2 deck. No Tesla percent.
Gigafactory Texas (Giga Austin) TeslaUnincorporated Travis County / Del Valle area, Austin, Texas, United StatesTesla HQ + vehicle plant: Model Y, Cybertruck, Cybercab. 4680 cells (>40 GWh Production), cathode materials (10 GWh Early Ramp). Cortex 1…>250,000 vehicles/year$10B202220,000 †operatingY/Cybertruck/Cybercab listed Production. Cybercab production started Q2 2026; employee campus rides July. Cortex 2 will ramp further over the rest of the year. Optimus building construction now in full swing. Lithium/cathode Early Ramp (see Robstown for LiOH). No Tesla percent.
Megafactory Lathrop (Megapack) TeslaLathrop, California, United StatesMegapack utility-scale battery storage manufacturing. First Megafactory. Q2 2026: 40 GWh Production.40 GWh/year—20221,000 †operatingProduction at 40 GWh nameplate. No Tesla-published 2026 utilization percent.
Tesla Lathrop (automotive parts / foundry support) no pin TeslaLathrop, California, United StatesFormer Chrysler parts-distribution building (acquired ~2014). Casting/foundry and parts support for Fremont. Distinct from the Megapack…885,867 sq_ft †—2014—operating—
Megafactory Texas (Brookshire / Megapack 3) TeslaBrookshire, Waller County, Texas, United StatesMegapack 3 / Megablock manufacturing. Q2 2026 listed Texas Megapack as Commissioning; Tesla Megapack account 6 Aug 2026: Megapack 3…50 GWh/year$190M20261,500 †rampingSOP 6 Aug 2026 (company X). Q2 outlook still on schedule for production starting in 2026; TechCrunch: 2026 volume language dropped. 50 GWh is designed, not run-rate.
Tesla Lithium Refinery (Corpus Christi / Robstown) TeslaNear Robstown / Corpus Christi, Nueces County, Texas, United StatesSpodumene-to-battery-grade lithium hydroxide refinery (first of its kind in North America per 10-K). Feeds 4680 / pack materials. Q2 2026…30 GWh/year$1B †2026250 †ramping10-K: commenced operations January 2026. Q2 2026: Early Ramp at 30 GWh-equivalent. Secondary fully ramped claims (EVwire July 2026) conflict with IR Early Ramp — use IR.
Gigafactory New York (Buffalo / Riverbend) TeslaBuffalo, New York, United StatesState-owned factory Tesla leases. Solar panel assembly (TSP-415/420 restarted late 2025; Q1 2026 customer shipments per Tesla Q4 2025…1,200,000 sq_ft †$959M20171,500 †operatingSolar panel assembly restarted; Supercharger production continues. Q2 2026: site work progressed for solar manufacturing (cells and panels) — may include Buffalo and/or additional US sites. No Tesla percent.
Tesla Tilburg (parts / former KD assembly) TeslaTilburg, North Brabant, NetherlandsKnock-down Model S/X final assembly until 2021; reconfigured to manufacture parts supporting European production/service.156,840.5 sq_m †—2013540 †operating—
Tesla Automation (Prüm / former Grohmann) TeslaPrüm, Rhineland-Palatinate, GermanyManufacturing equipment / automation (former Grohmann Engineering, acquired 2016-17). Builds production systems for Tesla factories…——2017800 †operating—
Terafab research / development fab (Giga Texas North Campus) jointNorth Campus, Gigafactory Texas, Travis County, Texas, United StatesTesla/SpaceX precursor semiconductor research fab: mask, logic, memory, packaging, test under one roof. Q2 2026: progress on construction…————construction—
Terafab (Grimes County full-scale chip factory) jointGibbons Creek / Grimes County, Texas, United States (near Navasota / College Station-Houston corridor)Planned vertically integrated advanced semiconductor fab (logic, memory, advanced packaging, test) jointly developed by Tesla and SpaceX…>100,000,000 sq_ft$16.8B—3,000 †planned—
Gigafactory Mexico (Nuevo León) TeslaSanta Catarina / Monterrey metro, Nuevo León, MexicoAnnounced March 2023 as next-gen vehicle plant. Musk 23 Jul 2024 earnings call: paused because of potential US tariffs on Mexico-built…—$10B †—10,000 †paused—
Tesla India factory (cancelled) no pin TeslaIndia (no site selected)Proposed local vehicle manufacturing tied to India's EV import-duty policy (15% duty if at least ~$500M local investment). India's Heavy…—$500M †——closed—
SpaceX Hawthorne (Falcon / Dragon / Merlin) SpaceXHawthorne, California, United StatesEngineering and manufacturing hub for Falcon 9, Falcon Heavy, Dragon, Merlin engines (and some Raptor work). Former HQ (HQ moved to…500,000 sq_ft †—20086,000 †operatingHigh-cadence Falcon production continues (97th F9 of 2026 as of 18 Aug). No company utilization percent.
SpaceX Starbase (Starfactory + launch) SpaceXStarbase (Boca Chica), Cameron County, Texas, United StatesStarship / Super Heavy production (Starfactory), Mega Bays, Massey's test site, OLP-1/OLP-2 launch towers, Gigabay vertical-integration…960 acres †$250M †2019—operatingStarfactory producing Block 3 vehicles; OLP-2 active (Flights 12-13); Pad 1 in retrofit. Gigabay construction underway, targeted complete end-2026 (SpaceX updates). Flight 14 NET slipping (airspace briefing listed 15 Sep 2026). No factory utilization percent.
SpaceX McGregor Rocket Development and Test Facility (Raptor/Merlin) SpaceXMcGregor, Texas, United StatesAcceptance testing of Merlin and Raptor engines; stage testing; Dragon defuel after splashdown. Raptor production capacity has been added…4,000 acres †—2003—operatingContinuous engine acceptance firing. NSF trackers have reported Raptor 3 serials into the 200s and dense two-week firing windows — tracker reports, not SpaceX rates. Company has not published 2026 Raptor production rate.
Kennedy Space Center LC-39A (Falcon Heavy / Starship pad) SpaceXKennedy Space Center, Merritt Island, Florida, United StatesFalcon Heavy and Falcon 9 launches (NASA crew/cargo and commercial). Starship launch pad being completed in 2026 (SpaceX updates). Only…——2017—operatingActive Falcon cadence. Starship pad construction in progress. Next FH: Nancy Grace Roman NET 30 Aug 2026 07:26 EDT (NASA FRR 21 Aug).
Cape Canaveral SLC-40 (Falcon 9) SpaceXCape Canaveral Space Force Station, Florida, United StatesPrimary East Coast Falcon 9 pad (Starlink, commercial, Crew/Cargo Dragon). Highest-cadence SpaceX orbital pad.——2010—operatingMultiple Falcon 9 flights per week typical. Example: Starlink 10-39 on 21 Aug 2026 from SLC-40 (B1078 flight 30).
Cape Canaveral SLC-37 (Starship pad, construction) SpaceXCape Canaveral Space Force Station, Florida, United StatesSecond Florida Starship pad. CFO Johnsen Q2 2026: activating pads at 39A and 37. SpaceX updates: Starship pad work at SLC-37.————construction—
KSC Roberts Road Gigabay / HangarX (Starship integration) no pin SpaceXKennedy Space Center (Roberts Road / HangarX), Florida, United StatesStarship vertical integration facility (Gigabay) next to HangarX. SpaceX updates: site prep begun; targeted complete and operational end of…————construction—
Vandenberg SLC-4E (Falcon 9 polar) SpaceXVandenberg Space Force Base, California, United StatesWest Coast Falcon 9 (and capable of Falcon Heavy) for polar/SSO, including Starlink. SLC-4W converted to Landing Zone 4. SpaceX also taking…——2013—operatingActive. Example: Starlink 17-50 on 18 Aug 2026 21:01 PDT, 100th SpaceX mission of 2026.
Colossus 1 (Memphis / former Electrolux) xAISouth Memphis, Tennessee, United StatesIndustrial-scale AI training cluster in a converted Electrolux factory. Company Colossus page: built in 122 days, doubled to 200k H100s in…>220,000 GPUs—2024—operatingCompany historical: 150,000+ GPUs running with 99% uptime (Colossus marketing page). May 2026 Anthropic lease implies Colossus 1 capacity is being sold/used. Epoch estimates exist but are independent models.
Colossus 2 / Macrohard (Tulane Road, Whitehaven) xAIWhitehaven, Memphis, Tennessee, United States (with associated generation/expansion in Southaven, MS)Second Memphis-area gigawatt-scale training campus. S-1: COLOSSUS II = Memphis + Southaven, MS, part of a coherent gigawatt-scale cluster…1 GW—2026—rampingS-1: first Colossus II cluster in 91 days. Epoch (estimate): ~110k B200 + 330k B300. Company has not published a 22 Aug 2026 GPU census.
Colossus / Southaven power and compute campus xAISouthaven, Mississippi, United StatesS-1 includes Southaven as part of COLOSSUS II. Industrial compute + associated gas generation adjacent to TVA Southaven Combined Cycle…——2025—ramping—
The Boring Company Bastrop (TBM / Prufrock factory + R&D HQ) BoringBastrop, Texas, United StatesPrimary Prufrock TBM manufacturing (Boring Factory) and R&D tunnels (PT4 Hyperloop test, PT5/PT6 ZPIT). Host of 2026 Not-a-Boring…——2021—operatingPrufrock-5 demonstrated on a live test tunnel at the 2026 student competition (company/event coverage). No TBM/year rate published.
Vegas Loop (operational tunnel system) BoringLas Vegas / Clark County, Nevada, United StatesOperating underground Loop (Tesla vehicles, human drivers). Industrial tunneling + operations, not a TBM factory. Company projects page…68 miles$47M2021—operatingCompany: original LVCC peak >4,500 pax/h and >32,000 pax/day. System still expanding (Prufrock-2 2.28-mile drive Mar 2026 per company X via Teslarati). Airport T1/T3 listed open on projects page.
Music City Loop (Nashville) BoringNashville, Tennessee, United StatesUnder-construction ~25-mile twin 12-ft ID tunnel Loop, downtown/MCC/Lower Broadway to West End to BNA. 100% privately funded. Two Prufrock…~25 miles———constructionTwo TBMs on-site and tunneling (FAQ 14 Aug 2026). Passenger-open date not on FAQ; local press cites early/spring 2027.
Dubai Loop (RTA pilot) no pin BoringDubai, United Arab EmiratesConstruction contract with Dubai RTA. Pilot 6.4 km, 4 stations. Company: construction to begin late 2026. Status on projects page: Under…6.4 km———planned—
Boring Company Hawthorne R&D tunnels BoringHawthorne, California, United StatesEarly R&D tunnels (part of the 7 tunnels / 3 cities). Historical test tunnel opened to the public Dec 2018. Not a TBM production plant.——2018—operating—